The Project
Oslo-based Renewable Energy Corporation ASA (REC) built the world’s largest manufacturing facility for solar energy products in Singapore. The first phase of the project involved the building of an integrated manufacturing facility on a 25-hectare site in Tuas—the western part of Singapore—at a cost of $2 billion USD.
The Tuas manufacturing complex produces solar wafers, cells and modules for the international power industry market. The first such clean and renewable energy plant in South East Asia, research and development forms an important part of the Tuas complex’s operations.
The REC manufacturing complex was built on a site that sat on reclaimed land, with soil less compact than natural soil. There were concerns with soil settlement and how this would affect waterproofing of the substructure. Due to the environment sensitive work that was carried out at this power industry manufacturing facility and laboratories, moisture and waterproofing specifications were set at a stringent 6% or less.
The tight construction schedule was another project challenge. A total of eight months was set aside for waterproofing work covering a surface area of more than 70,000m2. Fast and efficient application of the waterproofing product without compromising performance thus became a critical factor when considering waterproofing options.
Installing a high performing vapour barrier was key to ensuring below grade waterproofing. After careful evaluation, the power industry project team selected PREPRUFE® 300R pre-applied waterproofing membrane for the underside of base slabs.
PREPRUFE® membranes can be applied to smooth prepared concrete or compacted sand horizontally, or permanent formwork or adjoining structures vertically. This speeds up application and construction. Concrete is then cast directly against the membrane’s adhesive side.
PREPRUFE® waterproofing forms an integral bond with the concrete, providing a unique seal against the migration of water and remains unaffected by ground settlement beneath slabs.
Blue360sm Product Performance Advantage: Because every project, large or small, deserves the best level of protection.
gcpat.vn | For technical information: asia.enq@gcpat.com
GCP Applied Technologies Inc., 2325 Lakeview Parkway, Alpharetta, GA 30009, USA
GCP Vietnam Company Ltd, Lot B14, Section B, Street No. 12, Xuan Thoi Son Small Scale Arts & Crafts Group, National Road 22Xuan Thoi Son Village, Hoc Mon District, Ho Chi Minh City
This document is only current as of the last updated date stated below and is valid only for use in Vietnam. It is important that you always refer to the currently available information at the URL below to provide the most current product information at the time of use. Additional literature such as Contractor Manuals, Technical Bulletins, Detail Drawings and detailing recommendations and other relevant documents are also available on www.gcpat.vn. Information found on other websites must not be relied upon, as they may not be up-to-date or applicable to the conditions in your location and we do not accept any responsibility for their content. If there are any conflicts or if you need more information, please contact GCP Customer Service.
Last Updated: 2023-09-27
https://gcpat.vn/en-gb/about/project-profiles/2-billion-power-industry-plant-uses-preprufe-waterproofing-below-grade