The Project
In the southeastern U.S. and especially the Gulf Coast region, high winds and wet weather can wreak havoc on wood homes. Driven by the increased demand for more durable homes, Andrew Marshall, owner of Safeguard Building Products, needed a new commercial building plant for manufacturing his company’s metal studs and wind-resistant metal homes.
The challenge was that the new facility needed a high performance floor that would stand up to the rigours of busy operation. To ensure he got a durable concrete floor that would minimise shrinkage and cracking, Marshall turned to Doug Lambeth at Southeastern Concrete Company.
Drawing on his years of experience working with admixtures, Lambeth proposed an innovative concrete mix that would provide the results Marshall wanted—without the need for costly rebar or wire mesh reinforcement. He contacted GCP Applied Technologies for help. They, alongside the Engineering Services Group, worked with the owner’s structural engineer to help put any doubts to rest. To design the optimal mix, the team also relied on GCP's Slab On Ground Software—a valuable tool that helped determine the best dosages for the 2,500-yard (2,286-metre) concrete pour.
The specialised 4,000 p.s.i. mix included GCP's STRUX® 90/40 synthetic macro fibre reinforcement, an alternative to rebar or welded wire mesh, that maximises crack control, fatigue resistance and durability. In addition, ECLIPSE® Floor shrinkage reducing concrete admixture was added to minimise shrinkage and cracking during drying and enable extended joint spacing, and ADVA® 140M was used as a mid-range water reducer for pumpability and workability.
“I really thought the heavy dose of fibre in the mix was going to be a problem from a pumpability standpoint, but it didn’t cause us any grief at all”, said the contractor, Harry LeBlanc of Cajun Concrete Services. “We pumped and finished the concrete just the way it was all planned out on paper”.
The commercial building floor was finished with a laser screed, cut the same day, and covered with a vapour barrier after placement for seven days to maintain the desired moisture level.
The Results
“Even with our early entry soft cut sawing, we didn’t see any cracking at all”, added LeBlanc. “I thought that was pretty phenomenal”.
The extended spacing also meant lower labour costs for the commercial building since fewer joints needed to be cut and maintained.
“It‘s just a great mix to pour”, noted Marshall. “We got set times that were totally accurate, the performance we needed, and the mix enabled us to extend control joints to as far as 25 feet [7.6 metres] which worked better with our column spacing and helped our design team”.
In fact, the owner was so pleased with the hard work of everyone on the job, that at the end of each workday, he had a barbecue to feed everyone on the site.
Asked whether he’d use the mix design in the future, Marshall responded simply, “I don’t think I’d pour concrete again without it. That’s how well I think it performed”.
Blue360sm Product Performance Advantage: Because every project, large or small, deserves the best level of protection.
gcpat.vn | For technical information: asia.enq@gcpat.com
GCP Applied Technologies Inc., 2325 Lakeview Parkway, Alpharetta, GA 30009, USA
GCP Vietnam Company Ltd, Lot B14, Section B, Street No. 12, Xuan Thoi Son Small Scale Arts & Crafts Group, National Road 22Xuan Thoi Son Village, Hoc Mon District, Ho Chi Minh City
This document is only current as of the last updated date stated below and is valid only for use in Vietnam. It is important that you always refer to the currently available information at the URL below to provide the most current product information at the time of use. Additional literature such as Contractor Manuals, Technical Bulletins, Detail Drawings and detailing recommendations and other relevant documents are also available on www.gcpat.vn. Information found on other websites must not be relied upon, as they may not be up-to-date or applicable to the conditions in your location and we do not accept any responsibility for their content. If there are any conflicts or if you need more information, please contact GCP Customer Service.
Last Updated: 2023-09-27
https://gcpat.vn/en-gb/about/project-profiles/commercial-building-utilizes-gcp-technologies-solution-provide-durability